News

New Genset Installation for Power Back Up Assurance
New Genset Installation for Power Back Up Assurance

The new genset has newly installed for power supply back up for 2,000 KVA. The total back up is now become 2 X 2,000 KVA. This new Mitsubishi Generator Set is to back up the electricity when there is shutdown from PLN. With these Genset, Wisma Nusantara will fully be backed up for all power supply including Lightings, Servers, AC and Elevators of buildings for tenant’s smooth business.

op: 0 !important; }